SolutionFinder

Trades

 
The study, prefabrication, installation and commissioning:

- Sets and subsets (units, process, racks, utility)
- Piping single or double cover (vapor HP, MP, ...) according to European Directive 97/23 EC and Codeti 2006.
 
All maintenance and installation works on site: handling, lifting, installation, settings.
 
Requalification of pressure equipment following significant or non-significant repairs according to the Ministerial Order of March 15, 2000

Skid Loading / unloading
Soda Hub
(Nickel, Stainless and Uranus 45N)